French
Category
Real Estate
Real Estate Sale (457)
Luxury real estate (35)
Investment (19)
Real Estate for Rent (166)
Roomate (5)
Vacation Rentals (43)
mortgage, hypothec, life annuity
Others (12)
Cars, Vehicles
Used Cars (238)
Used motorcycles, Scooters (34)
Collection cars, motorcycles (3)
Auto, Moto Parts, Accessories (20)
Used motor-home, camper van and RVs (2)
Sailing, Boats (12)
Car Rentals (14)
Trucks and utility vehicles (13)
Agricultural Machines
Other vehicles (11)
Others (10)
Jobs
Job searchs (194)
Job Offers (134)
Student jobs, Summer Jobs (39)
MLM - Tele Commuting - Distance Work (3)
Internships (3)
Appliances
Refrigerators, freezers (7)
Vacuum cleaners, steam cleaning
Cooking (3)
Coffee Makers, espresso
Dishwasher
Washing machines, dryers
Sewing
Small appliances (1)
Pressing, Ironing
Other appliances (1)
Computer, Phone, Multimedia
Computers (40)
TV, Video, DVD player, VCR (6)
Consoles, Video Games (6)
Cameras, Video cameras (6)
Audio Equipment (15)
GPS
Telephones (19)
DVD, Movies
CD, Music
Books
Others (4)
Professional Equipment
Agricultural Material
Transport - Handling
Construction Machine
Construction Material (3)
Tools (2)
Industrial Equipment (1)
Catering - Hospitality
Office Supplies (1)
Shops & Markets (1)
Medical Material (1)
Home, Garden
Furniture (17)
Tableware
Home Decoration (3)
Household linen
Home and Garden (4)
Air Conditioning, Heating
Antiques, Collections (2)
Plants / Trees (1)
Wanted (1)
Cheap deals
Moving, Garage Sale (2)
Various (7)
Sports, Hobbies, Recreation
Sports (10)
Fishing, Hunting (1)
Camping
Bikes, Cycling (2)
Musical Instruments (3)
Games, Toys
Hobbies, Recreation
Going Out
Tickets
Concerts
Exhibitions (1)
Events (1)
Restaurants (2)
Bars, Cafe (1)
Various (1)
Clothing, Shoes, Luggages
Clothing (7)
Shoes (1)
Baby Equipment (2)
Luggages, Bags, Luggage Accessories (1)
Watches, Jewellery (2)
Various (1)
Health, Beauty
beauty, body products (3)
Health Products, disability
Various (1)
food, farm products, wine
food, farm products (2)
Wine
Various (1)
Competition
Design
Architecture
Literature
Music
Painting
Dance
Science
Innovations
Pets
Cats, Kittens (1)
Dogs, Puppies (55)
Horses (1)
Birds (2)
Fish, Aquarium (5)
Reptiles, Snakes, Lizards
Mice, Rats, Hamsters, Gerbis
Farm Animals (1)
Pets Supplies and Accessories (3)
Pet sitter (1)
breeding, mating (1)
Others (3)
Services
Services at Home (13)
Carpool, Rideshare
Tutoring, Courses, Lessons (101)
Translation
IT services, Computer Tech Help (7)
Tourism Guide (4)
Babysitting (6)
Beauty, hairdressing, body care, hair removal, massage (11)
health services, personal services (7)
Reparation, construction, plumber, electrician, gardener (14)
Cleaning, housekeeping (4)
Cooks, catering services (6)
Jurist (1)
Associations
Activities, Going Out (1)
Meeting
Missed connections, Messages (2)
Lost, Found
Barter, exchange
Others (31)
Tenders
Furniture
Automobiles and Parts
Print services
Sell
Cleaning / Dry Cleaning
Distribution
Electronic Goods / Services
Computers
Building Repairs
Software
Stationary
Medical Goods / Services
Advertising Services
Financial Services
Insurance
Consulting
Security Products / Services
Other Products
Other Services
Vacation housing
Seaside Vacation Rentals (14)
Mountain Vacation Rentals
Countryside Vacation Rentals
Abroad Vacation Rentals (9)
Others (6)
Personals
Man seeking Woman (7)
Woman seeking Man (3)
Man seeking Man (2)
Woman seeking Woman
Platonic Meeting (1)
Misc Romance (5)
Casual Encounters
Missed Connections
Sex Toys
websites
Movies
Video portals
Meeting
Music
Cars, motorbikes
Bicycle, cycling
The best
For girls
Entertainment
Photoshop
Photography
Sport
Shops
Cartoon
Games
Children
Mobile phone
Employment, jobs
Recipes
Adults
Classified ads
Pets
Medicine
Media
TV
Casino
Association
Government
Transport
Art, culture
Science, education
Design
Computer sciences
Internet
Classified Express!!!
Post your free classified ad
Bookmarks
Login
Sign up
advertisements
--- Category ---
Real Estate Sale
Luxury real estate
Investment
Real Estate for Rent
Roomate
Vacation Rentals
mortgage, hypothec, life annuity
Others
Used Cars
Used motorcycles, Scooters
Collection cars, motorcycles
Auto, Moto Parts, Accessories
Used motor-home, camper van and RVs
Sailing, Boats
Car Rentals
Trucks and utility vehicles
Agricultural Machines
Other vehicles
Others
Job searchs
Job Offers
Student jobs, Summer Jobs
MLM - Tele Commuting - Distance Work
Internships
Refrigerators, freezers
Vacuum cleaners, steam cleaning
Cooking
Coffee Makers, espresso
Dishwasher
Washing machines, dryers
Sewing
Small appliances
Pressing, Ironing
Other appliances
Computers
TV, Video, DVD player, VCR
Consoles, Video Games
Cameras, Video cameras
Audio Equipment
GPS
Telephones
DVD, Movies
CD, Music
Books
Others
Agricultural Material
Transport - Handling
Construction Machine
Construction Material
Tools
Industrial Equipment
Catering - Hospitality
Office Supplies
Shops & Markets
Medical Material
Furniture
Tableware
Home Decoration
Household linen
Home and Garden
Air Conditioning, Heating
Antiques, Collections
Plants / Trees
Wanted
Cheap deals
Moving, Garage Sale
Various
Sports
Fishing, Hunting
Camping
Bikes, Cycling
Musical Instruments
Games, Toys
Hobbies, Recreation
Going Out
Tickets
Concerts
Exhibitions
Events
Restaurants
Bars, Cafe
Various
Clothing
Shoes
Baby Equipment
Luggages, Bags, Luggage Accessories
Watches, Jewellery
Various
beauty, body products
Health Products, disability
Various
food, farm products
Wine
Various
Design
Architecture
Literature
Music
Painting
Dance
Science
Innovations
Cats, Kittens
Dogs, Puppies
Horses
Birds
Fish, Aquarium
Reptiles, Snakes, Lizards
Mice, Rats, Hamsters, Gerbis
Farm Animals
Pets Supplies and Accessories
Pet sitter
breeding, mating
Others
Services at Home
Carpool, Rideshare
Tutoring, Courses, Lessons
Translation
IT services, Computer Tech Help
Tourism Guide
Babysitting
Beauty, hairdressing, body care, hair removal, massage
health services, personal services
Reparation, construction, plumber, electrician, gardener
Cleaning, housekeeping
Cooks, catering services
Jurist
Associations
Activities, Going Out
Meeting
Missed connections, Messages
Lost, Found
Barter, exchange
Others
Furniture
Automobiles and Parts
Print services
Sell
Cleaning / Dry Cleaning
Distribution
Electronic Goods / Services
Computers
Building Repairs
Software
Stationary
Medical Goods / Services
Advertising Services
Financial Services
Insurance
Consulting
Security Products / Services
Other Products
Other Services
Seaside Vacation Rentals
Mountain Vacation Rentals
Countryside Vacation Rentals
Abroad Vacation Rentals
Others
Man seeking Woman
Woman seeking Man
Man seeking Man
Woman seeking Woman
Platonic Meeting
Misc Romance
Casual Encounters
Missed Connections
Sex Toys
Movies
Video portals
Meeting
Music
Cars, motorbikes
Bicycle, cycling
The best
For girls
Entertainment
Photoshop
Photography
Sport
Shops
Cartoon
Games
Children
Mobile phone
Employment, jobs
Recipes
Adults
Classified ads
Pets
Medicine
Media
TV
Casino
Association
Government
Transport
Art, culture
Science, education
Design
Computer sciences
Internet
--- City ---
Price
reference number
See on map
Top
Home
Search : groups.google.com/g/microsoft.public.project/c/jML8CJb5zQA
VIP classifieds
Click here to know how to put your classifieds as VIP.
click here to post your free classified ad now
save this search
Classified ads 1 - 30 out of 205
order by
price
|
relevance
1
2
3
4
5
...
7
Districte De Black River
>>
Albion
425 000MUR
To sell Kia Rio 2018 mileage 78500 in perfect condition
June 16, 2024
MAU1491297
Cars, Vehicles
>>
Used Cars
Districte De Plaines Wilhelms
>>
Vacoas-Phoenix
360 000MUR
Mercedes c180 kompressor for sale
September 22, 2022
MAU1450024
Cars, Vehicles
>>
Used Cars
Districte De Port Louis
1 000MUR
The answer for your car rental needs
September 12, 2022
MAU1430891
Nissan AK 13 available at Rs1000.00 per day. For long term, price is negotiable. Please call on +230 57972085 . Thank you.
Cars, Vehicles
>>
Car Rentals
Districte De Port Louis
1 000MUR
Rent a car
August 30, 2022
MAU1447890
Available for rent 🔆 Nissan AK13 ☎ For Booking, call or Whatsapp us on +230 57972085 Email :iascarrental01@gmail.com
Cars, Vehicles
>>
Car Rentals
Districte De Pamplemousses
>>
Triolet
800MUR
Car rental
June 29, 2022
MAU78261
car rental nissan march AK12, KIA PICANTO, NISSAN N16 Tel:7707445/2610482
Cars, Vehicles
>>
Car Rentals
Districte De Flacq
24 900 000MUR
SEAVIEW LUXURIOUS RESIDENCE IN THE NORTH-EAST OF MAURITIUS
June 10, 2022
MAU1440285
... Price : Apartments as from 172 sqm as from MUR 24 900 000* Penthouses + Rooftop Block A, B &
C
415 sqm – MUR 42 000 000* Penthouse + Rooftop Block D 227 sqm – MUR 40 000 000* *excluding fees A beachfront residence with direct beach and lagoon access ...
Real Estate
>>
Real Estate Sale
Districte De Black River
12 500 000MUR
CHARMING RESIDENCE 50 M FROM THE SEA IN BLACK RIVER – MAURITIUS
June 10, 2022
MAU1440283
... Status: Ready to move in Type: Apartment
G
+2 Seaview apartment : 130 sqm with 3 bedrooms, 2 bathrooms, fitted kitchen, living room, dining room, terrace seaview, cupboards, air conditioning, private parking… Residence: Shared swimming pool, guest parking ...
Real Estate
>>
Real Estate Sale
Districte De Port Louis
100 000MUR
Toyota Rav4 2.0 VVTi Automatic 2003
March 28, 2022
MAU1432762
TOYOTA RAV4, 52,000 MILES, FULL LEATHER INTERIOR, AIRCON, 4 ELECTRIC WINDOWS, 2 KEYS, ELECTRIC SUNROOF, ELECTRIC SIDE MIRRORS, CD PLAYER, ALLOY WHEELS WITH EXCELLENT TYRES.
Cars, Vehicles
>>
Used Cars
Districte De Black River
3 800 000MUR
3 apartments for sale at Flic en Flacq
March 27, 2022
MAU1432699
... No. 1 near parking - Rs4.2m including furniture and home appliances (armoire, commode, bed, canape set, ovens, A/
C
, kitchen set, refrigerator, washing machine, tv, wifi) No. 2 consisting of 2 rooms near the swimming pool for Rs3.8m including furniture and ... home appliances (armoire, commode, bed, canape set, ovens, A/
C
, kitchen set, refrigerator, washing machine, tv, wifi) No. 3 consisting of 3 rooms near the swimming pool for Rs4.8m including furniture and home appliances (armoire, commode, bed, canape set ... , ovens, A/
C
, kitchen set, refrigerator, washing machine, tv, wifi) Whatsapp on 5928 7582 for more information. ...
Real Estate
>>
Real Estate Sale
Districte De Rivière Du Rempart
>>
Pereybere
19 900 000MUR
SEAVIEW PENTHOUSE WITH PRIVATE ROOFTOP IN PEREYBERE - MAURITIUS
December 28, 2021
MAU1424442
... Reference: DIP557PONEB Accessibility: Mauritian & foreign (Purchase giving right to a Mauritian residence permit) Location: Pereybere, Mauritius Category: Resale Status: Ready to move in Type: Penthouse with seaview,
G
+2 Penthouse: 2 bedrooms and ...
Real Estate
>>
Real Estate Sale
Districte De Rivière Du Rempart
>>
Roches Noires
34 908 678MUR
NEW CLOSE BEACH VILLAS WITH GOLF VIEW & GOLF PACKAGE IN THE NORTH -EAST – MAURITIUS
December 28, 2021
MAU1424441
... Reference : DIP547VENN Accessibility : Mauritian & foreigner (Mauritian residence permit accessible with this purchase) Location : Roches Noires, Mauritius Category : New Status : Ready to move in Type : Freehold,
G
+1 villa Villas : 3 bedrooms, ...
Real Estate
>>
Real Estate Sale
Districte De Black River
>>
Cascavelle
14 800 000MUR
SUPERB HIGH-END DUPLEXES IN THE HEART OF CASCAVELLE SMART CITY FLIC EN FLAC – MAURITIUS
December 17, 2021
MAU1423656
... Reference : DIP539DXTGR Accessibility: Mauritian & foreigners Location: Cascavelle, Mauritius Category: Project, new, Smart City Status: Under construction - Delivery Dec 2023 Type: Duplexes (
G
+1) Duplex: 160 to 211 sqm - 3 and 4 bedrooms, Living ...
Real Estate
>>
Real Estate Sale
Districte De Rivière Du Rempart
>>
Pereybere
260 000€
13 204 809.54MUR
NICE 3-BEDROOM APARTMENT IN PEREYBERE - MAURITIUS
December 14, 2021
MAU1414893
... Reference : DIP535AMOU Location : Pereybere , Mauritius Category : Resale,
G
+2 residence Status : Already built – ready to move in Type : Fully furnished and equipped apartment Built area : 103 sqm Apartment : 3 bedrooms including 1 in the basement ...
Real Estate
>>
Real Estate Sale
Districte De Rivière Du Rempart
>>
Grand Baie
50 000 000MUR
SPLENDID BEACHFRONT FUTURE RESIDENCE & MARINA IN GRAND BAY – LAGOON VIEW – MAURITIUS
October 18, 2021
MAU1409449
... Location: Grand Baie, Mauritius Accessibility: Accessible to foreigners - Residence permit from unit purchase Category: New project with GFA (Residence facing the sea & private Marina) Status: Off-plan sale - VEFA Expected delivery: Dec 2023 Type:
G
...
Real Estate
>>
Real Estate Sale
Districte De Plaines Wilhelms
425 000MUR
Hyundai Santafe 2010
October 13, 2021
MAU1417670
good condition maintained with genuine parts
Cars, Vehicles
>>
Used Cars
Districte De Rivière Du Rempart
>>
Pereybere
35 000 000MUR
100 M FROM THE SEA! LARGE 1590 M² RESIDENTIAL SEAVIEW LAND IN PEREYBERE - MAURITIUS
August 27, 2021
MAU1405909
... The land has great potential and offers interesting development opportunities, perfect for construction of premium private villas or apartments through real estate development such as a
G
+ 2 project, duplexes or others. ...
Real Estate
>>
Real Estate Sale
Mauritius
RESEARCH INVESTORS FOR REAL ESTATE OR COMMERCIAL PROJECT FINANCING IN MAURITIUS
August 27, 2021
MAU1405704
... Reference: DIP520RI Accessibility: Mauritian and foreign investors Location: Mauritius Category: Financial investments Status:
G
+2, PDS or commercial projects Type: Apartments, penthouses, villas, hotels, offices . ...
Real Estate
>>
Investment
Districte De Rivière Du Rempart
>>
Cap Malheureux
35 000 000MUR
BEAUTIFUL 2 ACRES AND 50 PERCHES, APPROX 10 500 SQM RESIDENTIAL LAND IN BAIN BOEUF – MAURITIUS
August 27, 2021
MAU1405701
... The land has great potential and offers interesting development opportunities, perfect for the construction of villas or apartments by real estate development such as a
G
+2, PDS or other scheme project. ...
Real Estate
>>
Real Estate Sale
Districte De Rivière Du Rempart
>>
Grand Baie
26 000 000MUR
LARGE 8400 SQM RESIDENTIAL LAND VERY WELL LOCATED - HEART OF GRAND BAY - MAURITIUS
August 27, 2021
MAU1405632
... This land with great potential offers interesting development opportunities, perfect for a real estate construction either for a personal project: individual, family villa or for a real estate development such as a
G
+2 project, PDS or others. ...
Real Estate
>>
Real Estate Sale
Districte De Port Louis
425 000MUR
Car for Sale
August 13, 2021
MAU1411221
Toyota Vitz . 2014 . 93160 km . Call on 52578878
Cars, Vehicles
>>
Used Cars
Districte De Rivière Du Rempart
>>
Grand Baie
800MUR
Car Rental
July 13, 2021
MAU1408010
Suzuki Swift 1200 cc Automatic [Electrics, Media Player, Bluetooth, USB Port] For rent Short term (3 days minimum) & Long term Collection Point Grand-Bay E-mail : turquoisecr@gmail.com Contact No: 2638839 / 581111212 (WhatsApp)
Cars, Vehicles
>>
Car Rentals
Mauritius
65 000MUR
Buy An Opel Corsa Comfort! 2003
July 09, 2021
MAU1135612
Opel Corsa 2003 High Performance Ecotec 1.2 Engine manual Engine with Fuel economy 8L\100km and Hydrid Ready Engine: 1.2 16V (75 Hp) Doors: 5 Power: 75 hp/5600 rpm Maximum speed 170 km/h Acceleration 0 - 100 km/h: 13 sec Fuel tank volume: 44 Coupe ...
Cars, Vehicles
>>
Used Cars
Districte De Rivière Du Rempart
>>
Grand Baie
291 404€
14 799 747.38MUR
BEAUTIFUL SEMI-DETACHED VILLA ALREADY CONSTRUCTED WITH SWIMMING POOL AND GARDEN IN GRAND BAIE
June 18, 2021
MAU1389329
... Reference: DIP498TWTA Accessibility: Mauritian & foreigner (Mauritian residence permit accessible with this purchase) Location: Grand Bay, Mauritius Category: Resale Status: Semi-detached villa built sold furnished and equipped Type:
G
+2 Availability: ...
Real Estate
>>
Real Estate Sale
Districte De Rivière Du Rempart
>>
Grand Baie
6 600 000MUR
PRIVILEGED AREA! BEAUTIFUL RESIDENCE CLOSE BEACH AT POINTE AUX CANONNIERS
April 09, 2021
MAU1382521
... Reference: DIP492LAP Accessibility: Mauritian & foreigner Location: Pointe aux Canonniers, Mauritius Category: New project,
G
+2 Status: Off Plan Type: Apartments, Penthouses Availability: 1 to 3 bedroom apartments, 2 to 3 bedrooms penthouses Bedrooms ...
Real Estate
>>
Real Estate Sale
Districte De Rivière Du Rempart
>>
Pereybere
6 600 000MUR
MODERN RESIDENCE VERY CLOSE BEACH IN THE HEART OF PEREYBERE – MAURITIUS
March 26, 2021
MAU1379547
... Reference : DIP487SOL2 Accessibility : Mauritian & foreigner Location : Pereybere, Mauritius Type : Apartment and Penthouse Category : New Project, VEFA -
G
+2 Bedrooms : 2 Living area : 78 & 121 sqm Status : under construction Equipment : Apartments ...
Real Estate
>>
Real Estate Sale
Districte De Port Louis
>>
Port Louis
5 200 000€
264 096 190.76MUR
NICE 48 ROOMS BEACHFRONT 3* HOTEL LOCATED IN NORTH-WEST MAURITIUS
January 08, 2021
MAU1379392
... DIP482HCO Accessibility : Mauritian & foreigner Location : NORTH-WEST Mauritius Type : Hotel Category : 3* Bedrooms : 48 bedrooms Status : Ready – ONLY WALLS FOR SALE NOT RUNNING BUSINESS Equipment : outdoor pool and a children’s pool – both heated at 28°
C
, ...
Real Estate
>>
Luxury real estate
Districte De Rivière Du Rempart
>>
Grand Baie
11 200 000MUR
HIGH-END AREA ! SUMPTUOUS PENTHOUSES NICE SEA VIEW & CLOSE BEACH AT POINTE AUX CANONNIERS
January 08, 2021
MAU1382522
... Reference: DIP492PHLAP Accessibility: Mauritian & foreigner (Mauritian residence permit accessible with this purchase) Location: Pointe aux Canonniers, Mauritius Category: New project,
G
+2 Status: Off plan Type: Penthouses Availability: 2 to 3 bedrooms ... Price: 2 bedrooms penthouse as from MUR 11 200 000* 3 bedrooms penthouse as from MUR 14 700 000* *excluding other fees Magnificent
G
+2 residence with unique standing offering ocean and nature views. ...
Real Estate
>>
Real Estate Sale
Districte De Rivière Du Rempart
>>
Grand Baie
FOR INVESTOR! BEAUTIFUL FULL
G
+4 BUILDING PROJECT (PERMIT + LAND) FOR SALE IN GRAND BAIE
December 18, 2020
MAU1382524
... Reference: DIP493RSIE Accessibility: Mauritian & Foreign Location: Grand Baie, Mauritius Category: New project (Purchase of a 5-level residence project) Status: Under construction Type: Apartment and penthouse project –
G
+2 Residence Land area: 1 arpent ... Selling price: MUR 79,990,000 * all included (negotiable) Magnificent
G
+ 4 residences for sale in the heart of Grand Bay Become a developer in Mauritius by purchasing this residence under construction in the North of Mauritius. ... The
G
+4 permit has been validated (ground floor and 4 additional floors) for 2 buildings. ...
Real Estate
>>
Real Estate Sale
Districte De Savanne
>>
Bel Ombre
32 383 774MUR
MAGNIFICENT CONTEMPORARY OFF-PLAN VILLAS IN THE HEART OF SOUTHERN AUTHENTIC
December 11, 2020
MAU1380316
... private swimming pool, sea view, Golf or mountain (your choice), sea access… Others: Project located in a luxury estate - Very low density construction Selling price: Villas B of 300 m² - Single storey villa with 2 to 3 bedrooms from MUR 32 383 774 Villas
G
...
Real Estate
>>
Real Estate Sale
Districte De Port Louis
>>
Port Louis
12 124 578MUR
SUBLIM RESIDENCE 300 M ONLY FROM BEACH AND ACCESS BEACH CLUB IN PEREYBERE - MAURITIUS
October 21, 2020
MAU1379390
... Reference : DIP4882BEA Accessibility : Mauritian & foreigner Location : Pereybere, Mauritius Type : Apartments, Penthouses Category : New project,
G
+2 Bedrooms : 2 Living area : 113 to 181 Sqm Status : off plan – Delivery 2022 Equipment : Apartments ...
Real Estate
>>
Real Estate Sale
1
2
3
4
5
...
7
advertisements