French
Category
Real Estate
Real Estate Sale (457)
Luxury real estate (35)
Investment (19)
Real Estate for Rent (166)
Roomate (5)
Vacation Rentals (43)
mortgage, hypothec, life annuity
Others (12)
Cars, Vehicles
Used Cars (238)
Used motorcycles, Scooters (34)
Collection cars, motorcycles (3)
Auto, Moto Parts, Accessories (20)
Used motor-home, camper van and RVs (2)
Sailing, Boats (12)
Car Rentals (14)
Trucks and utility vehicles (13)
Agricultural Machines
Other vehicles (11)
Others (10)
Jobs
Job searchs (194)
Job Offers (134)
Student jobs, Summer Jobs (39)
MLM - Tele Commuting - Distance Work (3)
Internships (3)
Appliances
Refrigerators, freezers (7)
Vacuum cleaners, steam cleaning
Cooking (3)
Coffee Makers, espresso
Dishwasher
Washing machines, dryers
Sewing
Small appliances (1)
Pressing, Ironing
Other appliances (1)
Computer, Phone, Multimedia
Computers (40)
TV, Video, DVD player, VCR (6)
Consoles, Video Games (6)
Cameras, Video cameras (6)
Audio Equipment (15)
GPS
Telephones (19)
DVD, Movies
CD, Music
Books
Others (4)
Professional Equipment
Agricultural Material
Transport - Handling
Construction Machine
Construction Material (3)
Tools (2)
Industrial Equipment (1)
Catering - Hospitality
Office Supplies (1)
Shops & Markets (1)
Medical Material (1)
Home, Garden
Furniture (17)
Tableware
Home Decoration (3)
Household linen
Home and Garden (4)
Air Conditioning, Heating
Antiques, Collections (2)
Plants / Trees (1)
Wanted (1)
Cheap deals
Moving, Garage Sale (2)
Various (7)
Sports, Hobbies, Recreation
Sports (10)
Fishing, Hunting (1)
Camping
Bikes, Cycling (2)
Musical Instruments (3)
Games, Toys
Hobbies, Recreation
Going Out
Tickets
Concerts
Exhibitions (1)
Events (1)
Restaurants (2)
Bars, Cafe (1)
Various (1)
Clothing, Shoes, Luggages
Clothing (7)
Shoes (1)
Baby Equipment (2)
Luggages, Bags, Luggage Accessories (1)
Watches, Jewellery (2)
Various (1)
Health, Beauty
beauty, body products (3)
Health Products, disability
Various (1)
food, farm products, wine
food, farm products (2)
Wine
Various (1)
Competition
Design
Architecture
Literature
Music
Painting
Dance
Science
Innovations
Pets
Cats, Kittens (1)
Dogs, Puppies (55)
Horses (1)
Birds (2)
Fish, Aquarium (5)
Reptiles, Snakes, Lizards
Mice, Rats, Hamsters, Gerbis
Farm Animals (1)
Pets Supplies and Accessories (3)
Pet sitter (1)
breeding, mating (1)
Others (3)
Services
Services at Home (13)
Carpool, Rideshare
Tutoring, Courses, Lessons (101)
Translation
IT services, Computer Tech Help (7)
Tourism Guide (4)
Babysitting (6)
Beauty, hairdressing, body care, hair removal, massage (11)
health services, personal services (7)
Reparation, construction, plumber, electrician, gardener (14)
Cleaning, housekeeping (4)
Cooks, catering services (6)
Jurist (1)
Associations
Activities, Going Out (1)
Meeting
Missed connections, Messages (2)
Lost, Found
Barter, exchange
Others (31)
Tenders
Furniture
Automobiles and Parts
Print services
Sell
Cleaning / Dry Cleaning
Distribution
Electronic Goods / Services
Computers
Building Repairs
Software
Stationary
Medical Goods / Services
Advertising Services
Financial Services
Insurance
Consulting
Security Products / Services
Other Products
Other Services
Vacation housing
Seaside Vacation Rentals (14)
Mountain Vacation Rentals
Countryside Vacation Rentals
Abroad Vacation Rentals (9)
Others (6)
Personals
Man seeking Woman (7)
Woman seeking Man (3)
Man seeking Man (2)
Woman seeking Woman
Platonic Meeting (1)
Misc Romance (5)
Casual Encounters
Missed Connections
Sex Toys
websites
Movies
Video portals
Meeting
Music
Cars, motorbikes
Bicycle, cycling
The best
For girls
Entertainment
Photoshop
Photography
Sport
Shops
Cartoon
Games
Children
Mobile phone
Employment, jobs
Recipes
Adults
Classified ads
Pets
Medicine
Media
TV
Casino
Association
Government
Transport
Art, culture
Science, education
Design
Computer sciences
Internet
Classified Express!!!
Post your free classified ad
Bookmarks
Login
Sign up
advertisements
--- Category ---
Real Estate Sale
Luxury real estate
Investment
Real Estate for Rent
Roomate
Vacation Rentals
mortgage, hypothec, life annuity
Others
Used Cars
Used motorcycles, Scooters
Collection cars, motorcycles
Auto, Moto Parts, Accessories
Used motor-home, camper van and RVs
Sailing, Boats
Car Rentals
Trucks and utility vehicles
Agricultural Machines
Other vehicles
Others
Job searchs
Job Offers
Student jobs, Summer Jobs
MLM - Tele Commuting - Distance Work
Internships
Refrigerators, freezers
Vacuum cleaners, steam cleaning
Cooking
Coffee Makers, espresso
Dishwasher
Washing machines, dryers
Sewing
Small appliances
Pressing, Ironing
Other appliances
Computers
TV, Video, DVD player, VCR
Consoles, Video Games
Cameras, Video cameras
Audio Equipment
GPS
Telephones
DVD, Movies
CD, Music
Books
Others
Agricultural Material
Transport - Handling
Construction Machine
Construction Material
Tools
Industrial Equipment
Catering - Hospitality
Office Supplies
Shops & Markets
Medical Material
Furniture
Tableware
Home Decoration
Household linen
Home and Garden
Air Conditioning, Heating
Antiques, Collections
Plants / Trees
Wanted
Cheap deals
Moving, Garage Sale
Various
Sports
Fishing, Hunting
Camping
Bikes, Cycling
Musical Instruments
Games, Toys
Hobbies, Recreation
Going Out
Tickets
Concerts
Exhibitions
Events
Restaurants
Bars, Cafe
Various
Clothing
Shoes
Baby Equipment
Luggages, Bags, Luggage Accessories
Watches, Jewellery
Various
beauty, body products
Health Products, disability
Various
food, farm products
Wine
Various
Design
Architecture
Literature
Music
Painting
Dance
Science
Innovations
Cats, Kittens
Dogs, Puppies
Horses
Birds
Fish, Aquarium
Reptiles, Snakes, Lizards
Mice, Rats, Hamsters, Gerbis
Farm Animals
Pets Supplies and Accessories
Pet sitter
breeding, mating
Others
Services at Home
Carpool, Rideshare
Tutoring, Courses, Lessons
Translation
IT services, Computer Tech Help
Tourism Guide
Babysitting
Beauty, hairdressing, body care, hair removal, massage
health services, personal services
Reparation, construction, plumber, electrician, gardener
Cleaning, housekeeping
Cooks, catering services
Jurist
Associations
Activities, Going Out
Meeting
Missed connections, Messages
Lost, Found
Barter, exchange
Others
Furniture
Automobiles and Parts
Print services
Sell
Cleaning / Dry Cleaning
Distribution
Electronic Goods / Services
Computers
Building Repairs
Software
Stationary
Medical Goods / Services
Advertising Services
Financial Services
Insurance
Consulting
Security Products / Services
Other Products
Other Services
Seaside Vacation Rentals
Mountain Vacation Rentals
Countryside Vacation Rentals
Abroad Vacation Rentals
Others
Man seeking Woman
Woman seeking Man
Man seeking Man
Woman seeking Woman
Platonic Meeting
Misc Romance
Casual Encounters
Missed Connections
Sex Toys
Movies
Video portals
Meeting
Music
Cars, motorbikes
Bicycle, cycling
The best
For girls
Entertainment
Photoshop
Photography
Sport
Shops
Cartoon
Games
Children
Mobile phone
Employment, jobs
Recipes
Adults
Classified ads
Pets
Medicine
Media
TV
Casino
Association
Government
Transport
Art, culture
Science, education
Design
Computer sciences
Internet
--- City ---
Price
reference number
See on map
Top
Home
Search : groups.google.com/g/microsoft.public.project/c/cQYdUpHUGpk
van hilux
Back
Mauritius
225 000MUR
van hilux
December 24, 2019
MAU82318
4x4 hilux for sale year 2001 in good condition 2800cc first come first serve.
Contacts :
Send a message
,
Type :
4x4
Brand :
Toyota
Model :
hilux
Year :
2001
Horse Power :
2800c.
Emissions Tax :
2800c.
Energy :
Diesel
Color :
Green
Interior :
Cloth
Interior Color :
Beige
Gearbox :
Manual
Vehicule inspection :
To do
Number of Doors :
4 doors
Features :
Steering, Manual A/C, Radio CD
Security Equipment :
4 wheel drive, Traction, Alarm, Checking tire pressure
Misc Equipment :
Alloy Wheels, Metallic paint, No smoking
Report abuse
Cars, Vehicles
>>
Used Cars
save this search
Classified ads 31 - 60 out of 205
order by
price
|
relevance
1
2
3
4
5
...
7
Districte De Pamplemousses
>>
Triolet Trou Aux Biches
381 000€
19 340 975.55MUR
SEAVIEW APARTMENT! NICE BEACHFRONT APARTMENT AT TROU AUX BICHES - MAURITIUS
October 09, 2020
MAU1356801
... Services included : 24/7 security, Maid, garden and swimming pool Maintenance, Sat TV & DSTV, Free Wi-Fi, A/
C
… Selling prices: MUR 16 000 000 or around 381 000 €* *without fees DIRECT ACCESS TO THE BEACH! ...
Real Estate
>>
Real Estate Sale
Districte De Rivière Du Rempart
237 500€
12 056 382.39MUR
SUPERB VILLA WITH BIG LAND, PRIVATE POOL & CLOSE SEA IN CALODYNE - MAURITIUS
September 11, 2020
MAU1355289
... This sublim 270 sqm villa is built on a plot of land of 1200 sqm and it is composed of: 4 bedrooms, 3 Baths, Huge living room & dining room, Fitted kitchen, A/
C
, Large garden, Beautiful terrace, Garage, 5 x 3 m swimming pool… This magnificent villa has ...
Real Estate
>>
Real Estate Sale
Districte De Rivière Du Rempart
>>
Grand Gaube
1 100€
55 840.09MUR
TO LET! SUPERB VILLA WITH BIG LAND, POOL & CLOSE SEA IN CALODYNE - MAURITIUS
September 11, 2020
MAU1355238
... This sublim 270 sqm villa is built on a plot of land of 1200 sqm and it is composed of: 4 bedrooms, 3 Baths, Huge living room & dining room, Fitted kitchen, A/
C
, Large garden, Beautiful terrace, Garage, 5 x 3 m swimming pool… This magnificent villa has ...
Real Estate
>>
Real Estate for Rent
Districte De Plaines Wilhelms
200 000MUR
Toyota Passo year 2009 for sale
August 13, 2020
MAU1369610
Price negotiable
Cars, Vehicles
>>
Used Cars
Districte De Black River
240 000MUR
CITROËN C4 PICASSO 2011 & 156.000 Km
May 12, 2020
MAU1356956
Essence 5 seats (3 real seats in the back) Air conditioning front and rear Automatic or manual gearbox (your choice) Steering wheel radio control Metallic blue 156,000 km First registration in July 2011
Cars, Vehicles
>>
Used Cars
Mauritius
900 000MUR
NISSAN QASHQAI 1.6 DCI VISIA MT 4WD-STD 1598CC
May 12, 2020
MAU1356952
Diesel 5 places Air conditioner 6-speed manual transmission Steering wheel radio control White 34,000 km Regular maintenance at Nissan dealership First registration in October 2017
Cars, Vehicles
>>
Used Cars
Districte De Plaines Wilhelms
>>
Curepipe
80 000MUR
Toyota Vitz
April 17, 2020
MAU1304482
In good condition, without any problem, for more information send a message directly by Whatsapp:.+23052970038
Cars, Vehicles
>>
Used Cars
Districte De Rivière Du Rempart
>>
Grand Baie
120 000MUR
Toyota Corolla
April 15, 2020
MAU1304142
Toyota Corolla in good condition for sale at 120,000 rupee, for more information sent a message directly by Whatsapp:.+23058690092
Cars, Vehicles
>>
Used Cars
Districte De Pamplemousses
675 000MUR
NISSAN QASHQAI FOR SALE
January 28, 2020
MAU991781
Excellent Car in perfect condition, fully loaded with Nissan original accessories, serviced every 4-6 months, one owner.
Cars, Vehicles
>>
Used Cars
Districte De Rivière Du Rempart
>>
Belle Vue Maurel
120MUR
Volksawgen Polo Classic 1997
January 28, 2020
MAU75120
Dr's car, good running condition, injection engine, Fuel consumption Rs 2.17 per km, insurance & declaration June 2012
Cars, Vehicles
>>
Used Cars
Districte De Rivière Du Rempart
12 500€
634 546.44MUR
Used 2013 Toyota Vitz
January 28, 2020
MAU991504
The Year 2013 • Right Hand Drive Hatchback • Mileage: 78,000 km • Engine: 1.3 L • Gasoline • Automatic • Front-Wheel Drive • Service Plan: Maintenance of • Motor Plan: the Maintenance of • Service history: No • Warranty: 6 months • Finance: Available The ...
Cars, Vehicles
>>
Collection cars, motorcycles
Districte De Plaines Wilhelms
>>
Vacoas-Phoenix
1 000 000MUR
bmw
January 27, 2020
MAU79155
VERY URGENT SALES BMW 318i for sale urgent!URGENT SALES! new shape BMW 318i DEC 2008 YEAR OF MANUFACTURE: 2008 ENGINE CAPACITY: 1995 CC TRANSMISSION: MANUAL COLOUR: Blue BMW 318I SE 318I SE 4 DOOR SALOON 1million negociated very urgent Call on ...
Cars, Vehicles
>>
Used Cars
Districte De Plaines Wilhelms
>>
Vacoas-Phoenix
1 000 000MUR
CAR SALES
January 27, 2020
MAU79150
VERY URGENT SALES BMW 318i for sale urgent!URGENT SALES! new shape BMW 318i DEC 2008 YEAR OF MANUFACTURE: 2008 ENGINE CAPACITY: 1995 CC TRANSMISSION: MANUAL COLOUR: Blue BMW 318I SE 318I SE 4 DOOR SALOON 1million negotiated very urgent Call on ...
Cars, Vehicles
>>
Used Cars
Districte De Port Louis
>>
Port Louis
3 000€
152 291.15MUR
2006 KAWASAKI NINJA
January 27, 2020
MAU80770
... Kawasaki ZX 599 cc ZX600-P7F 1 OWNER, 2011, 13500 miles, BLUE, R&
G
FAIRING PROTECTION POSTS, TAIL TIDY, HUGGER IN LOVELY CONDITION, EVERY BIKE HPI CHECKED, NATIONWIDE DELIVERY AVAILABLE. ...
Cars, Vehicles
>>
Used motorcycles, Scooters
Mauritius
916 497MUR
2013 Toyota, FJ Cruiser
January 27, 2020
MAU81115
Colour Ebony Fuel type Petrol - Premium ULP Body WAGON Release Year 2013 Series GSJ15R Transmission Automatic No. gears 5 No. doors 5 Seat capacity 5 Country of origin JAPAN Transmission Automatic Engine size 6 cyl, 4L Kilometres 11,829km
Cars, Vehicles
>>
Used Cars
Mauritius
SALE OF TOYOTA BELTA CAR 2006
January 27, 2020
MAU77094
selling of car
Cars, Vehicles
>>
Used Cars
Mauritius
Bosch Car Service
January 27, 2020
MAU82022
... Car maintenance & repairs for all brands of vehicles: - Inspection & Servicing - Brakes - Electric / Electronic - Fuel system inspection - Headlamp beam alignment - Air conditioning systems check-up - A/
C
system refills - Wheel alignment - Wheel balancing ...
Cars, Vehicles
>>
Other vehicles
Districte De Plaines Wilhelms
170 000MUR
Suzuki Ignis car for sale
January 27, 2020
MAU849636
For sale Suzuki Ignis year 2002 1300 cc. Price: Rs 170 000 (neg) Tel: 52576340.
Cars, Vehicles
>>
Used Cars
Districte De Plaines Wilhelms
>>
Vacoas-Phoenix
KIA Sportage
January 26, 2020
MAU75910
Unique Opportunity Sale -Large and Spacious -Excellent Condition -Fully Executive -Year 2005 -1975 cc -Leather Seat Cover - Contact on 7017858
Cars, Vehicles
>>
Used Cars
Mauritius
20 000€
1 015 274.31MUR
FOR SALE : Lexus LX 570 2013
January 26, 2020
MAU4161
I have a Neatly Used 2013 Lexus Lx 570 For Sale, Perfect Condition, Very Neat both inside and Outside. For more pictures and car details contact me. My Email : moh.cr10@hotmail.com
Cars, Vehicles
>>
Trucks and utility vehicles
Districte De Port Louis
>>
Port Louis
2012 Land Rover Range Rover Sport HSE
January 26, 2020
MAU80738
fairly used custom built car, selling cheap. only interested and serious buyers contact for more details
Cars, Vehicles
>>
Used Cars
Mauritius
200 000MUR
Car for sale
January 24, 2020
MAU82395
Cars, Vehicles
>>
Used Cars
Mauritius
425 000MUR
Car for Sale
January 24, 2020
MAU82394
Cars, Vehicles
>>
Used Cars
Districte De Plaines Wilhelms
>>
Curepipe
160 000MUR
URGENT Sale!
January 24, 2020
MAU81725
Hyundai Matrix year 2003, Engine 1400cc, Mileage: 191,000km. Manual gear, petrol, electric windows, ABS, Power Steering, aircon etc. Registration & Insurance to renew in March 2015. Very fuel efficient and Amazingly Spacious - a real family car!
Cars, Vehicles
>>
Used Cars
Mauritius
For sale
January 24, 2020
MAU82012
... For Sale Mercedes
C
- Class AMG ...
Cars, Vehicles
>>
Used Cars
Mauritius
380 000MUR
Occasion Unique Seul proprietaire Toyota Yaris Hatchback - Manual Japan Full Option
January 24, 2020
MAU82010
Occasion Unique Seul proprietaire Toyota Yaris Hatchback - Manual Japan Full Option 1000cc Etat Neuf 41000 km Serviced only at Toyota Mauritius :Battery BOSCH (New),: Tyre Bridgestone (New) Price: 380,000 Call Yan: 5 2584509
Cars, Vehicles
>>
Used Cars
Mauritius
2 500MUR
Truck renault master diesel
January 23, 2020
MAU846818
Renault Master truck creperie box auto 2009, 175000 km, engine diesel (designed by professional) including 2 biligues 1 3 cold room doors (consumption 900 w) a showcase refrigerated drink a water bath, a saladette a freezer, a water point, and a generator 5000 ...
Cars, Vehicles
>>
Trucks and utility vehicles
Districte De Rivière Du Rempart
>>
Pereybere
240 000€
12 183 291.68MUR
Villas for sale in Peyrebere
January 22, 2020
MAU78245
... With all amenities and individual large swimming pool, cctv,alarme 24/24 monitoring, a/
c
,burglar bars,3 bedrooms( 1 master) ,PVC openings etc.May be rent also on long term. ...
Real Estate
>>
Real Estate Sale
Districte De Grand Port
>>
Mahébourg
Renault Laguna for sell
January 22, 2020
MAU80010
Body: Sedan ( 5 doors) Condition:Excellent Mileage:70000 km Fuel:Petrol Transmission: Manual, 5 gears Exterior color:Grey metallic Interior:Air Conditioning, Dual Climate Control, Power Mirrors, Power Windows, Power Door Locks, Power Steering, Rear Air ...
Cars, Vehicles
>>
Used Cars
Mauritius
140 000MUR
Toyota Duet
January 22, 2020
MAU81864
Excellent private car with excellent economy of 16 to 17 Kms per ltr with air con and full options. Selling because going out of country. An excellent vehicle to cherish.
Cars, Vehicles
>>
Used Cars
1
2
3
4
5
...
7
advertisements