Top
Districte De Plaines Wilhelms
URGENt!Ford Ranger 2011 XLE 3.0 TDCI
  • URGENt!Ford Ranger 2011 XLE 3.0 TDCI
  • URGENt!Ford Ranger 2011 XLE 3.0 TDCI
  • URGENt!Ford Ranger 2011 XLE 3.0 TDCI
  • URGENt!Ford Ranger 2011 XLE 3.0 TDCI
  • URGENt!Ford Ranger 2011 XLE 3.0 TDCI
610 000MUR

URGENt!Ford Ranger 2011 XLE 3.0 TDCI

October 10, 2019
MAU997901
Ford Ranger 2011 XLE 3.0 TDCI
Outstanding Off-Road performance
Outstanding towing performance
Leather Seats
Tuff Liner
Rear Fogs
Stainless Steel Side steps
Stainless Steel Roll Bar
Towing Ball
Rear Sensors
Media + Aux for mobile phones.
Bridgestone Duelers AT Tyres 255/70/R16
6 CD Front Loading.
6 speakers
170 000km
Contacts : Send a message,
  • Type : 4x4
  • Brand : Ford
  • Model : RANGER 3.0 XLE
  • Year : 2011
  • Mileage : 1700000Km
  • Horse Power : 2998c.
  • Energy : Diesel
  • Color : White
  • Interior : Leather
  • Interior Color : Black
  • Gearbox : Manual
  • Vehicule inspection : perfect
  • Number of Doors : 4 doors
  • Features : Power Windows, Power locking, Steering, Manual A/C, Radio CD, Radio MP3, Electric mirrors
  • Security Equipment : 4 wheel drive, Traction, Fog lights, Cruise Control, Alarm, Airbag (s)
  • Misc Equipment : Tuning, Alloy Wheels
Cars, Vehicles >> Used Cars
See on map
Classified ads 121 - 150 out of 205
order by price | relevance

advertisements