Top
Districte De Flacq
Toyota Axio G
  • Toyota Axio G
  • Toyota Axio G
425 000MUR

Toyota Axio G

November 30, 2019
MAU82882
Axio G Package one owner only well maintained car private. Manual transmission with monitor rear camera,alloy rims fog lamps climate control keyless entry,Push start contact tel 5 4932510
Contacts : Send a message,
  • Type : Sedan
  • Brand : Toyota
  • Model : Axio
  • Year : 2007
  • Mileage : 60Km
  • Horse Power : 1500c.
  • Emissions Tax : 1500c.
  • Energy : Petrol
  • Color : Light Gray
  • Interior : Cloth
  • Interior Color : Gray
  • Gearbox : Manual
  • Vehicule inspection : perfect
  • Number of Doors : 4 doors
  • Features : Power Windows, Power locking, Steering, Automatic A/C, Radio CD, Radio K7, Radio MP3, DVD Player, Electric mirrors
  • Security Equipment : ABS, Cruise Control, Airbag (s), ESP
  • Misc Equipment : Alloy Wheels, Trip Computer, Metallic paint
Cars, Vehicles >> Used Cars
Classified ads 181 - 205 out of 205
order by price | relevance

advertisements