Top
Districte De Port Louis >> Port Louis
SUBLIM RESIDENCE 300 M ONLY FROM BEACH AND ACCESS BEACH CLUB IN PEREYBERE - MAURITIUS
  • SUBLIM RESIDENCE 300 M ONLY FROM BEACH AND ACCESS BEACH CLUB IN PEREYBERE - MAURITIUS
  • SUBLIM RESIDENCE 300 M ONLY FROM BEACH AND ACCESS BEACH CLUB IN PEREYBERE - MAURITIUS
  • SUBLIM RESIDENCE 300 M ONLY FROM BEACH AND ACCESS BEACH CLUB IN PEREYBERE - MAURITIUS
  • SUBLIM RESIDENCE 300 M ONLY FROM BEACH AND ACCESS BEACH CLUB IN PEREYBERE - MAURITIUS
12 124 578MUR

SUBLIM RESIDENCE 300 M ONLY FROM BEACH AND ACCESS BEACH CLUB IN PEREYBERE - MAURITIUS

October 21, 2020
MAU1379390
Reference : DIP4882BEA
Accessibility : Mauritian & foreigner
Location : Pereybere, Mauritius
Type : Apartments, Penthouses
Category : New project, G+2
Bedrooms : 2
Living area : 113 to 181 Sqm
Status : off plan – Delivery 2022
Equipment :
Apartments : 2 bedrooms, kitchen, living and dining room, bathroom and terrace
Penthouses : 2 bedrooms, kitchen, living and dining room, bathroom, huge terrace and private pool
Criteria : Sea view, close beach, close Pereybere commodities…
Others : common pool, parking, visitor parking, exclusive access to a private Beach Club, 200 m away from the Pereybere beach and very closed to Grand Bay
Availability : 2 bedrooms apartments and penthouses
Price : Apartments – MUR 12 124 578
Penthouse – MUR 16 094 578

Spread over 3 buildings, the 24 apartments of this sumptuous residence offer the perfect living experience for couples and families, with spacious rooms and luxurious amenities. The architecture is chic and modern with a traditional touch.
The residence includes a swimming pool and landscaped tropical garden. The 24/7 secure residence offers exclusive access to the private Pereybere Beach Club just 150 meters away.
Turnkey option with furniture pack available. Very close to the fine sandy beach and turquoise lagoon… Superb!

Contact us for more information, photos or a visit.
Dream Immo Properties present in France, Dubai, Portugal and Mauritius.
Contacts : Send a message,
  • Property type : Apartment
  • Area : 113m²
  • Number of rooms : 3
  • Number of bedrooms : 2
  • Amenities : Parking, Patio, Swimming pool
  • Proximity : School, Supermarket, Sea
Real Estate >> Real Estate Sale
Classified ads 121 - 150 out of 205
order by price | relevance

advertisements