Top
Mauritius
SLIP baseboards and tile: Public buildings, schools, swimming pools, showers, Houses .
45€ 2 303.89MUR

SLIP baseboards and tile: Public buildings, schools, swimming pools, showers, Houses .

November 06, 2019
MAU943220
The tile is recommended by health controls for food kitchens and other laboratories to guarantee hygiene and easier cleanings.
 
George has -plinthe tiles adhesive epoxy mortar Flex-seal patch.

Special anti slippery tiles for laboratory kitchens are ideal for use in areas at risk of slipping limited as locker rooms, bathrooms, hallways .
coating specialist for the food and knowing all the uses and constraints in this area, we are also best placed to help you maintain the quality of your coating over time.
 
We offer 4 types of tiles in three colors (beige, light gray, ivory)
 
Diamond Head 3 crayon
Corindonné 3 crayon
3 Square pellets crayon
3 structured crayon with 7.6 mn thickness dimension: 20x20 30x30 is also
 
E classification UPEC standards
U to wear from walking or passage;
P for punching: furniture legs or heels;
E for water resistance;
C for resistance to common chemical agents.
 
ISO-10545-2 standards
ISO-10545-3 standards
ISO-10545-4 standards
ISO-10545-6 standards
ISO 10545-12 standards
ISO 10545-13 standards
ISO 10545-14 standards
51130 R10 / R13 51130 / A + B + C 51097 / DIN 51130 V4 coformed
 
 
DECOMAT 93
249 bis Boulevard Gabriel peri
93130 Noisy le Sec
Contacts : Send a message,
Professional Equipment >> Tools
Classified ads 181 - 205 out of 205
order by price | relevance

advertisements