Top
Rodrigues
Renault Clio 1.4 Dynamic
2 100€ 106 603.80MUR

Renault Clio 1.4 Dynamic

November 13, 2019
MAU947545
Beautiful Clio 1.4 dynamic 2006, Blue metallic with Cloth interior.
Non-Smoker; only 76000 Km on the odometer.
Complete revision made the 9/4/2016. The timing Belt and water pump have been changed.
It is supplied with 2 Keys.
Contact via whatsapp for more information.

Whatsapp : +33 7 56 91 63 07
Contacts : Send a message
  • Type : Sedan
  • Brand : Renault
  • Model : Clio
  • Year : 2006
  • Mileage : 76000Km
  • Energy : Petrol
  • Color : Blue
  • Interior : Cloth
  • Interior Color : Other
  • Gearbox : Manual
  • Vehicule inspection : OK
  • Number of Doors : 5-door (Hatchback 4 +)
  • Features : Power Windows, Power locking, Steering, Manual A/C, Automatic A/C, Radio CD, Radio K7, Radio MP3, DVD Player, Electric mirrors, Heated Seats, GPS, Parking Aid
  • Security Equipment : 4 wheel drive, Traction, Fog lights, ABS, Cruise Control, Alarm, Airbag (s), ESP, Checking tire pressure
  • Misc Equipment : Alloy Wheels, Trip Computer, Metallic paint, No smoking
Cars, Vehicles >> Used Cars
Classified ads 31 - 60 out of 205
order by price | relevance

advertisements