Top
Mauritius
I want to sell my used Lexus LX570 GCC Specs.
  • I want to sell my used Lexus LX570 GCC Specs.
15 000€ 767 964.44MUR

I want to sell my used Lexus LX570 GCC Specs.

October 07, 2019
MAU81759
I want to sell my LEXUS LX570, the car is neatly used and well maintained with no Accident record. Clean and neat interior and exterior.

I use the car perosnally, and i bought it new few month ago. The car is still in Perfect condition, Full option and in good shape

Gulf specification,

Interested buyer


Serious buyer Only
Contacts : Send a message
  • Type : 4x4
  • Brand : Lexus
  • Model : lx570
  • Year : 2013
  • Energy : Petrol
  • Color : White
  • Interior : Leather
  • Interior Color : Beige
  • Gearbox : Automatic
  • Vehicule inspection : OK
  • Number of Doors : 4 doors
  • Features : Power Windows, Sunroof, Power locking, Steering, Automatic A/C, Radio K7, Radio MP3, DVD Player, Electric mirrors, Heated Seats, GPS, Parking Aid
  • Security Equipment : 4 wheel drive, Traction, Fog lights, ABS, Cruise Control, Alarm, Airbag (s), ESP, Checking tire pressure
  • Misc Equipment : Alloy Wheels, Hitch, Trip Computer, Metallic paint, Rain Sensor, Ignition lights
Cars, Vehicles >> Used Cars
Classified ads 181 - 205 out of 205
order by price | relevance

advertisements