Top
Districte De Plaines Wilhelms >> Quatre Bornes
For Sale Renault Megane II
245 000MUR

For Sale Renault Megane II

October 11, 2019
MAU81765
For Sale, Renault Megane II, year 2007, 1600cc, Fully executive, Automatic Air Con, Power Steering, Remote Central Locking, Electric Windows, Electric mirrors, Alloy wheels, Air Bags, ABS, Leather seats, Reverse Sensors, Cruise control.etc. In very good condition. Rs 245,000 or nearest offer. Call: 54238812
Contacts :
  • Type : Sedan
  • Brand : Renault
  • Model : Magane II
  • Year : 2007
  • Mileage : 150000Km
  • Energy : Petrol
  • Color : Blue
  • Interior : Leather
  • Interior Color : Beige
  • Gearbox : Manual
  • Vehicule inspection : perfect
  • Number of Doors : 4 doors
  • Features : Power Windows, Power locking, Steering, Automatic A/C, Radio CD, Electric mirrors, Parking Aid
  • Security Equipment : Fog lights, ABS, Cruise Control, Airbag (s), ESP, Checking tire pressure
  • Misc Equipment : Alloy Wheels, Trip Computer, Rain Sensor, Ignition lights, No smoking
Cars, Vehicles >> Used Cars
Classified ads 1 - 30 out of 205
order by price | relevance

advertisements