Top
Districte De Plaines Wilhelms
Car for Sale
  • Car for Sale
  • Car for Sale
  • Car for Sale
  • Car for Sale
  • Car for Sale
  • Car for Sale
  • Car for Sale
  • Car for Sale
330 000MUR

Car for Sale

December 02, 2019
MAU958069
For Sale, Lady Driven car single owner, Very low Mileage ( 44K) & Service by IMC.
Chevrolet Optra LS HatchBack 1.4cc, Yr 09
PS, AC, CL, Rear Sensor, EW, Airbag etc.
Excellent Condition
CALL for price 59877990
Contacts : Send a message,
  • Brand : Chevrolet
  • Model : Optra HatchBack
  • Year : 2009
  • Mileage : 44000Km
  • Horse Power : 1400c.
  • Energy : Petrol
  • Color : Blue
  • Interior : Cloth
  • Interior Color : Gray
  • Gearbox : Manual
  • Vehicule inspection : perfect
  • Number of Doors : 5-door (Hatchback 4 +)
  • Features : Power Windows, Power locking, Steering, Manual A/C, Radio CD, Electric mirrors, Parking Aid
  • Security Equipment : Fog lights, ABS, Alarm, Airbag (s)
  • Misc Equipment : Alloy Wheels, Trip Computer, Metallic paint, Ignition lights, No smoking
Cars, Vehicles >> Used Cars
See on map
Classified ads 1 - 30 out of 205
order by price | relevance

advertisements