Top
Districte De Pamplemousses >> Terre Rouge
Car Citroën DS5 for sale
1 100 000MUR

Car Citroën DS5 for sale

October 07, 2019
MAU856901
Car in new condition, never damaged or retouching done. Petrol engine 1600cc. All maintenances are at the agency. All options include: 2 electric seats, leather cushions, panoramic roof, back camera, integrated Bluetooth, alloy wheels, keyless option, among others. The price is negotiable.
Contacts : Send a message,
  • Brand : Citroen
  • Model : DS5
  • Year : 2012
  • Mileage : 80000Km
  • Energy : Petrol
  • Color : Dark Gray
  • Interior : Leather
  • Interior Color : Black
  • Gearbox : Automatic
  • Number of Doors : 5-door (Hatchback 4 +)
  • Features : Power Windows, Automatic A/C, Radio MP3, Electric mirrors
  • Security Equipment : ABS, Airbag (s)
  • Misc Equipment : Alloy Wheels, Metallic paint
Cars, Vehicles >> Used Cars
See on map
Classified ads 1 - 30 out of 205
order by price | relevance

advertisements