Top
Districte De Rivière Du Rempart >> Grand Baie
BEAUTIFUL SEMI-DETACHED VILLA ALREADY CONSTRUCTED WITH SWIMMING POOL AND GARDEN IN GRAND BAIE
  • BEAUTIFUL SEMI-DETACHED VILLA ALREADY CONSTRUCTED WITH SWIMMING POOL AND GARDEN IN GRAND BAIE
  • BEAUTIFUL SEMI-DETACHED VILLA ALREADY CONSTRUCTED WITH SWIMMING POOL AND GARDEN IN GRAND BAIE
  • BEAUTIFUL SEMI-DETACHED VILLA ALREADY CONSTRUCTED WITH SWIMMING POOL AND GARDEN IN GRAND BAIE
  • BEAUTIFUL SEMI-DETACHED VILLA ALREADY CONSTRUCTED WITH SWIMMING POOL AND GARDEN IN GRAND BAIE
291 404€ 14 861 204.42MUR

BEAUTIFUL SEMI-DETACHED VILLA ALREADY CONSTRUCTED WITH SWIMMING POOL AND GARDEN IN GRAND BAIE

June 18, 2021
MAU1389329
Reference: DIP498TWTA
Accessibility: Mauritian & foreigner (Mauritian residence permit accessible with this purchase)
Location: Grand Bay, Mauritius
Category: Resale
Status: Semi-detached villa built sold furnished and equipped
Type: G+2
Availability: 3 bedrooms + 1 office
Living area: 170 sqm
Villa: 3 bedrooms including the master bedroom en suite, office, reading area, living room / dining room, fitted kitchen, store, storage space under the oak staircase, covered terrace, deck, natural private pool, 2 Deck terraces, living room / Outdoor dining room on terrace, pergola and planter .
Others: closed to Grand Baie La Croisette, Super U and the beach
Criteria: Very close to shops, shopping centers and the beach

Price: 14 000 000 Rps* without fees

This beautiful semi-detached villa sold fully furnished is equipped with fiber optical, alarm, Dalafix high pressure solar water heater, roof air extractor and fitted with contemporary custom furniture. It is located in the center of Grand-Baie, close to all amenities and leisure.

Luxury residence received Awards for its design and quality of materials used.
It includes : a communal swimming pool, a biological filtration system for private swimming pools, a generator, a 24/7 security service, a connection to the whole sewer .

Contact us for more information, photos or a visit.
Dream Immo Properties present in France, Dubai, Portugal and Mauritius.
Contacts : Send a message,
  • Property type : House
  • Area : 170m²
  • Number of rooms : 5
  • Number of bedrooms : 3
  • Amenities : Parking, Patio, Swimming pool, Garden, yard
  • Proximity : School, Public Transport, Supermarket, Shops, Sea
Real Estate >> Real Estate Sale
Classified ads 121 - 150 out of 205
order by price | relevance

advertisements